Project Overview
Design and construction of a new restaurant in Leederville. Working closely with the owners and design team to create the vision for their new venture.
Aurora replaced the existing tired shop front with new tile and...
Posted at 06:57h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="grid" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Refurbishment of the old Emporio Bar and Cafe presented many challenges due in part to the age of the existing fitout and the lack of available documentation. The site hadn’t been touched for 18 years....
Posted at 06:51h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="grid" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Located in a heritage-listed building, this was the founding father of Perth’s small bar scene. We were engaged to bring the inspired design and vision to life, which meant understanding the concept, being sympathetic to...
Posted at 06:45h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Starting from a blank floor plate, the Perth Chest Clinic fitout covered both public and private work areas for this specialised sector.
Works completed included the installation of new hydraulics for 12 medical treatment rooms; fitout...
Posted at 06:41h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora was contracted to convert a tired old retail tenancy into a new SKG Radiology Branch, with a complete strip out of the current tenancy including removal of all existing services back to a shell....
Posted at 06:39h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
The Oral Health Centre is a state-of-the-art dental teaching and learning facility united within an oral health clinic. This project involved modifying and upgrading the existing ground floor reception area and converting a reception/waiting area...
Posted at 06:36h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
As one of the nominated head contractors, Aurora was engaged to design and construct a number of medical suites at the new Wexford Centre, Murdoch.
Each of the specialist consulting rooms was unique to suit the...
Posted at 06:34h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
This project involved refurbishment works across various areas of the UWA’s main library, the Reid Library. The job had to be completed during the crucial close down period, however many areas were still in operation....
Posted at 06:32h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora was engaged to refurbish lab spaces to comply with PC2 (physical containment level two) requirements. This presented a unique challenge working in a partially occupied building with long running experiments (some of them going...
Posted at 06:27h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
The general works of this project were to design, construct and fitout a training facility for Psychiatric and Counselling Services at ECU that integrated into a new build. This involved new training rooms, offices, observation...