A Waterfront 1
26 Eastbrook Tce
East Perth WA 6004

T 08 9287 2556

F 08 9287 2659

E admin@nullaurorapg.com.au

OHCWA - Aurora PG
529
portfolio_page-template-default,single,single-portfolio_page,postid-529,ajax_fade,page_not_loaded,,qode_grid_1300,side_area_uncovered_from_content,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive
 

OHCWA

About This Project

Project Overview

The Oral Health Centre is a state-of-the-art dental teaching and learning facility united within an oral health clinic. This project involved modifying and upgrading the existing ground floor reception area and converting a reception/waiting area on Level 1 into four dental clinics.

The works included relocating the existing reception desk to a temporary location while construction was being completed to ensure continuity of service for the clients and end users.

PROJECT VALUE: $500,000 - $1m
PROJECT DURATION: 16 weeks
PROJECT SIZE: 500sqm

The right way

Working in a live environment required careful and meticulous planning to ensure no services were suspended without two weeks notice prior to suspension. Works within areas with high hygienic sensitivity had to be carried out with great precision and care to ensure the cleanliness and sterile environments. Erection of the structural steel for the reception pergola was staged after hours to remove the risk to public and staff.

Significant amounts of structural steel work was undertaken to support newly built meeting rooms, timber pergola, auto sliding door and x-ray machines. The construction was managed in smaller stages to ensure as little disruption as possible to the daily operation of the centre, which sees over 500 staff and visitors go through the reception area each day.

Category
Healthcare