Project Overview
Aurora was engaged directly by Microsoft for the design and construction upgrade of the existing office at 100 St Georges Tce.
The project required the Front of House to be “opened–up” as a client and visitor friendly space, while still insuring a contemporary reception area was present.
Throughout the remainder of the tenancy the demolition and construction of a new breakout area, meetings rooms, quiet rooms and open plan working areas provided the staff with new sophisticated spaces.



The right way
Working with multiple stakeholders, including the appointed designer IA Design, in multiple locations, the project team was able to deliver a high quality project which both utilised the traditional Microsoft branding in an elegant manger and abided by the strict budget.