Project Overview
Aurora was engaged by CBRE and the client Investa Property Group to create two tenancy show suites, a tenancy base build upgrade and refurbished bathrooms and lobby on Level 6, 66 St Georges Tce.
Tenancy A...
Posted at 01:55h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora was engaged by FLUX/Hawaiian to complete the construction management services for FLUX level 6 and 7 at Parmelia House, 191 St Georges Tce.
Aurora’s early engagement on the project, working with the Designer IA Design,...
Posted at 04:53h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora was engaged directly by Microsoft for the design and construction upgrade of the existing office at 100 St Georges Tce.
The project required the Front of House to be “opened–up” as a client and visitor...
Posted at 04:48h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
The Department of Main Roads has been progressively upgrading their corporate office within East Perth. Aurora Project Group was contracted initially for level 3 fitout, then followed by level 6, which included the demolition and...
Posted at 04:45h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora Project Group was engaged by CBRE for the construction of the new HPI corporate office and showroom at 140 St Georges Tce on the basis of a Lump Sum Head Contractor agreement.
Aurora worked with...
Posted at 04:32h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora Project Group was engaged by Knight Frank working with IA Design to deliver an additional stage of works within 55 St Georges Terrace. This additional stage consisted of three Show Suite on lv 3,...
Posted at 06:25h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
This project was for the co-location of 10 government agencies into a new shared facility in Karratha. This project was completed in a short time fame, with little client inspection due to the remote location.
With...
Posted at 06:19h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
This was a complete ground floor fitout for the Licensing Section of the WA Police Department. Works included the installation of new flooring, partitioning, utility areas, staff breakout areas, offices and meeting rooms, a secure...
Posted at 06:16h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]
Project Overview
Aurora was engaged to provide complete project management for the new office fitout spanning three floors in the CBD. Works included the installation and co-ordination of all mechanical and IT services, joinery, breakout areas, workstations...
Posted at 06:09h
in
by admin
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" el_class="borderleft"][vc_column width="1/2"][vc_column_text]Aurora initially won the Level Four Project, which we delivered above expectations. That delivery helped us secure the subsequent lower ground, ground and Level One Project.
LEVEL 4 - Project Overview
This was the first stage in a...