Project Overview
Aurora was engaged to refurbish lab spaces to comply with PC2 (physical containment level two) requirements. This presented a unique challenge working in a partially occupied building with long running experiments (some of them going for years) that could not be disturbed or have their environments altered. The solution involved careful planning of shutdowns and back-up power generation to enable experiments to be undisturbed.
Works included the demolition, refurbishment and upgrade to the existing CSIRO Laboratory to meet PC2 Compliance (AS2243.3 Safety in laboratories: Microbiological aspects and containment facilities); full mechanical upgrade of the base building including controls; the installation of specialised hydraulics and medical gases; new general office and workstation areas, and all fittings, fixtures and finishes to comply with PC2 requirements.